We had another week of typical Bend winter weather during the last week, with periods of sun, rain, and snow. The ground is white and it looks like a white Christmas is assured, so I won’t need to play the old Bing Crosby tune to set the mood!
The sound booths are firmly set in their new home, so interior work will continue around them. In the next few days the construction team will blow in the insulation, and interior framing should begin soon after. Construction is ahead of schedule, which bodes well for our planned move in late March.
In the figure above, panel 1 shows the building from the NNE. Panels 2 and 3 show the sound booths in their permanent locations, and panel 4 shows a long view from the east to the west end of the building, with protective tarps covering the sound booths. Panel 5 shows miscellaneous construction, and panel 6 shows the location of Pacific Northwest Audiology relative to High Lakes Health Center.
Pacific Northwest Audiology will move to the Shevlin Health and Wellness Center by early April. Check back often. We will continue to update the building progress every week!